Far Eastern Air Transport
HOME | | |
FAT Engine Maintenance Department.
Maintenance & operation started in 1958.Maintenance Experience over 44 years.Shop Flow in Total (All Engine Models) 2178.
JT8D-Series Engine Shop Visit since 1977: 350 Total, 25/Year.
JT8D-217C/219 Engine Shop Visit since 1993: 107 Total, 10/Year.
JT8D Series Test Cell Started since 1977.
Modify JT8D-217C/219 Test Cell Started since 1993.
Present Customers:
Domestic Airline
ASIS Pacific Airline
CENTRAL LEASE CORP
POLARIS HOLDING CO.
GE CAPITALAVIATION SERVICES
All Assembly Tooling Available. To Date 2 Engines can be Handled Parallel. Up To 6 Engines Sequentially. Shop Flow In Total 40 Engines/Year. Growth Potential Available As Required.
Contact Us

Copyright(c)2005 F.A.T. All rights Reserved.